1 - 2 Nov, 2017 | Hilton Houston Post Oak by The Galleria, Houston, TX

Jorge Mitidieri

Executive Vice-President
Odebrecht Oil & Gas
Graduated as a Chemical Engineering at Federal University of Rio de Janeiro in 1982 he has been working for Brazilian companies as Natron Consultoria e Projetos, Jaraguá and IESA Oil & Gas. Mr. Mitidieri joined Odebrecht Organization in 1997 as Project Manager of Construtora Norberto Odebrecht (CNO) responsible for EPC contracts for industrial projects. In 2002 after a 2 years period working in the Offshore market he returned to Odebrecht Organization as a Project Manager for Upstream Projects becoming a Project Director in 2006. In 2007 as VP in CNO he became responsible for International Projects and in 2009 joined Odebrecht Oil & Gas as a VP for Integrated Services, responsible for Production Units, Subsea and Offshore maintenance. PMP from Project Management Institute since 2003 he has also a degree for MBA in Petroleum Business from Fundação Getulio Vargas and since 2015 is Alumni dor London Business Scholl with an Executive and Finance Seminar. Jorge is 58 years old, married since 1984 and father of two adults. He loves sports and practice regularly cycling, Gym and Pilates. He is a great fan of Fluminense Football Club in Rio de Janeiro.


11:45 AM Case-Study: Successful Delivery of Libra FPSO based on a EPC lump sum model

After an investment of more than USD1bn and 4,000 people over a period of two years, the FPSO Pioneiro de Libra left Singapore’s Jurong Shipyard in March 2017 for Brazil, where it will be the first FPSO to produce oil from the country’s Libra Block, one of the largest pre-salt oil reserves in the world. This session will discuss the key learning points that could be learnt from the entire EPC process, the main challenges the company faces during the entire project, and how it managed to innovate to solve some of these issues.
 


Check out the incredible speaker line-up to see who will be joining Jorge .

Download The Latest Agenda